Sediment Pond Treatment and Discharge – South Ripley, QLD

Location: South Ripley, QLD

Client: BMD Constructions

Duration: March 2017 – Ongoing

Clearpro was engaged to manage the treatment and discharge of a 32ML sediment basin on a large construction project. The stormwater within the basin had high turbidity levels due to dispersive clay soils and needed to be discharged into a sensitive freshwater stream. Turbidity reductions from over 1000NTU to 10NTU were consistently achieved using one of our DSR dosing units and two clarifying tanks.

Project Info

Date: