Yamba, NSW
Pipeline Dewatering – Yamba, NSW
The Yamba Quays Canal Estate development required wellpoint and sump dewatering to handle high flows and challenging sandy conditions near the Clarence River...
Whether you require mobile water treatment equipment for your dewatering project or a fully customised water treatment system for an industrial site, our team of experts will be able to develop a solution to meet your needs.
Our dedicated approach to water treatment sets us apart from our competitors who can’t match our service delivery and specialised knowledge. Clearpro focuses on building strong client relationships and is able to count some of Australia’s largest construction companies as regular clients.
The Yamba Quays Canal Estate development required wellpoint and sump dewatering to handle high flows and challenging sandy conditions near the Clarence River...
Clearpro designed and constructed a replacement sludge thickener for Nepean Dam Water Treatment Plant, featuring automated controls and remote monitoring capabilities…
Clearpro managed groundwater levels during the Deception Bay Road Interchange Upgrade, addressing pH variations from soil and concrete to ensure compliant water discharge...
Clearpro constructed and operated a 12L/s water treatment system for a multi-storey building project, targeting high dissolved iron and reducing turbidity and heavy metals...
Clearpro helped Tomato Exchange in Guyra, NSW, by treating stormwater run-off ponds to supply an additional 200,000L/day of clean water for their tomato greenhouse…
Clearpro provided water treatment and environmental monitoring for a 12-storey high-rise development, ensuring groundwater was treated before release into the Maroochy River...
A major sewer network upgrade in Surfers Paradise required multiple dewatering and water treatment systems due to tidal impacts and significant groundwater extraction…
Clearpro was engaged by Hazell Bros for dewatering and water treatment on the Byron Bay Bypass project, mitigating environmental impacts in sensitive wetlands...
Clearpro is dewatering a 22m deep launch shaft for the Biggera Waters to South Stradbroke Island recycled water pipeline, handling flow rates of up to 1.2ML/day...
Clearpro partnered with NO-DES for a pilot trial with Sydney Water, using robotic cleaning to remove sludge from reservoirs and treat water for re-use...
Clearpro provided water treatment and environmental monitoring for the construction of a basement in Toukley, treating water before release into Tuggerah Lake…
Clearpro was engaged for stages 2 and 3 of a high-rise development, using a spear system and larger clarification setup to manage groundwater seepage…
Clearpro was contracted to dewater a multi-storey development in Robina, utilizing multiple sumps, an automatic dosing system, and a clarifying tank...
A major stormwater upgrade in Miami required three Clearpro water treatment systems to treat acidic and turbid groundwater before release into Miami Lake...
The installation of a large underground tank required open excavation with three dewatering pumps producing 30L/sec, requiring pH correction before discharge...
Clearpro was tasked with designing a ‘bolt-on’ pH correction system for a portable sediment tank to neutralize acidic and alkaline water...
Clearpro was engaged as the water treatment contractor for perimeter dewatering at Metricon Stadium, utilizing an advanced containerised treatment system...
The project involved continuous treatment and discharge from a large sediment basin with low pH and high turbidity due to organic matter...
Clearpro was engaged as the dewatering contractor for a high-rise project in Tweed Heads, managing intermittent flows and high turbidity…
Lendlease required a specialist contractor for water treatment on the Kingsford Smith Drive Upgrade Project near the Brisbane River…
Clearpro was approached by Interflow to assist with water treatment on a project involving cleaning and re-lining of stormwater pipe…
→ Sloping floor for easy sludge removal
→ Fold down handrail and walkway (15,000L systems only)
→ Tube settler modules for enhanced settlement of suspended particles
→ Multiple sized inlets and outlets for flexibility across a variety of applications
→ Small footprint to volume ratio
→ Potable and non-potable water treatment plants made to order.
→ Treatment capacities of 4 - 6 L/sec.
→ Autonomously provides pH adjustment and turbidity control.
→ Able to be operated remotely with data logging and alarm functions.
→ Can be configured to automatically shut-down when discharge water quality does not comply with the relevant criteria.
→ Removes common dissolved metals and suspended solids.
→ Optional filtration attachments for improved water quality.
→ Automated pH control and floc dosing.
→ Lockable chemical storage area.
→ Tube settler clarifying tank.
→ Telemetry system enabling remote operation, data logging and alarm functions for water quality, flow and chemical level.
→ Optional solar panel and battery system for controllers and dosing pumps.
→ Fold down handrail and walkway.
→ Sloping floor for easy removal of sludge.
→ pH controller and sensors.
→ Optional turbidity sensor.
→ Tube settler clarifying tank.
→ Telemetry system enabling remote operation, data logging and alarm functions.
→ Chemical dosing pumps.
→ Solar power supply.
→ Custom housing.