Location: Bokarina, QLD
Client: Walter Iezzi Property Group – Azzure Bokarina, Ground Support Systems
Duration: September 202 – June 2023
Project Overview:
Construction of a multi-storey building with double-level basement carpark.
Working in conjunction with GSS who provided dewatering services on the project, Clearpro constructed and operated a 12L/s water treatment system. Using our unique filtration system to target high dissolved iron levels existing in the groundwater beneath the site we were able to achieve a high standard of water treatment to comply with local regulations. Turbidity, suspended solids and heavy metals were all reduce to trace levels prior to release into the environment.