pH Correction System – Gold Coast, QLD

Location: Gold Coast

Client: Hutchinson Builders

Duration: N/A

Project Overview:

Clearpro was asked to design and construct a pH correction system to be integrated into portable sediment tank. The brief from the client was to come up with a ‘bolt-on’ system which could be incorporated into the existing sediment tank to enable neutralisation of acidic and alkaline water. The compact design of this system allows it to be used in a variety of applications with only simple plumbing modifications required. A separate chemical storage housing was provided in order to comply with the relevant safety standards.

Project Info

Date: