Metricon Stadium Dewatering – Carrara, QLD

Location: Metricon Stadium, Carrara QLD

Client: Hanson Yuncken

Duration: September 2017

Project Overview:

Clearpro was engaged as the water treatment contractor on a dewatering project at Metricon Stadium. The project involved perimeter dewatering around an in-ground water tank to allow for maintenance works to be undertaken. Due to the high profile of the site, a high level of water treatment was required to satisfy both the client and council requirements. The project was the first for the latest containerised water treatment system in the Clearpro fleet, featuring automated chemical dosing, remote operation, continuous data logging and 15m3 clarification tank capacity.

Project Info

Date: